Choose the actual vehicle position before arranging the work: suitable private driveway or a lawful street location. Obtain the property’s consent, dimensions, time window and access contact. Keep sidewalks, driveways, fire access and neighboring entrances usable. An empty curb is not a reserved unloading space.
The County’s roadway and park-and-ride page distinguishes locally maintained roads from VDOT roads, including Patterson Avenue/Route 6, Pemberton Road/Route 157 and Broad Street/Route 250. Confirm the owner of the affected segment. The Gaskins/Mayland, Glenside and Parham/Fordson commuter lots prohibit commercial vehicles and trailers; they are not a backup staging plan for a moving truck.
If the plan occupies or affects public right-of-way, ask the appropriate owner which approval and traffic arrangements apply. Henrico’s Work in Right of Way procedure explains its construction-related permit route; its existence does not establish a universal permit for every ordinary parked moving vehicle, a reserved curb or a guaranteed approval time. Resolve a lane, sidewalk or other affected public space before dispatch.
The County community-maintenance rules restrict parking of trucks or commercial vehicles over 10,000 pounds gross weight, commercial trailers and wreckers in residential or agricultural districts, except on farms or while loading, unloading or working at or near the parked location. The exception does not grant exclusive curb rights. A residential portable storage container, outside the construction-site exception, is limited to one period of no more than ten consecutive days per six months and cannot occupy a front yard, right-of-way, parking or loading area, required parking space, drive aisle, sidewalk, pedestrian way, fire lane or required landscaped area. Arrange a compliant private position and property permission before delivery.
For a managed property, obtain any lift or loading reservation, insurance requirement, protection rules, deposit and named person who can release access. Pass a building-specific labor condition to the moving coordinator before booking. Then trace the whole route through doors, all stairs, landings, turns and the final room. Send the actual floor, measurements, restricted hours and receiver’s contact, including any gate or drive conditions the vehicle must negotiate.